No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
---|---|---|---|---|---|---|
1 | FM ENGINEERING | 93.741.816.8-808.000 | Rp. 114.565.000,00 | Rp. 114.565.000,00 | Rp. 114.565.000,00 |
No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
---|---|---|---|---|---|---|
1 | FM ENGINEERING | 93.741.816.8-808.000 | Rp. 114.565.000,00 | Rp. 114.565.000,00 | Rp. 114.565.000,00 |